Up

Rail_Labor_Mgmt_17_1215.pdf

Rail_Labor_Mgmt_17_1215.pdf
File Size:
81.05 kB
Date:
19 January 2018

Rail Services Sub Labor Management Meeting

December 15, 2017

William Lehman Center

Conf Rm A, 10:00 a.m. 

Old Business Items    1. Yard Signage/ No Clearance Update (09.21.12)  Per Mr. Wright, package was prepared for the entire system but TWU is mainly concerned about the yard signs. Mr. Wright inquired why signs had to be installed until test track was completed. Signs are crucial for new Train Operators.  Setting criteria, to be approved by Safety w/ assistance from Engineering; within next 2 months. Safety to provide criteria.  Entire Mainline will be marked w/ No Clearance signs (Federally mandated - FTA requirement to indicate the Right of Way) different shapes of mainline signs (Ongoing)  (11.17.17 & 12.15.17) 90% complete.  Open (TWU requested item to remain open until signs have been installed)
 Waiting for Safety to identify criteria. To be checking with FTA/FDOT 2

 
 
 

TWU

LOCALS